A practical panel-based theatre option configured to the room layout and hospital project scope. Unicare coordinates planning, manufacturing and installation as one project for hospitals, architects and healthcare contractors.

Project features

  • Room-specific planning and panel layout
  • Integration with laminar air flow, medical gases, electrical and control systems
  • Coordinated installation, testing and handover
  • Material and finish selection based on the approved project brief

Applications

  • New hospital operation theatres
  • Existing OT renovation and upgrades
  • Multispecialty and specialist surgical facilities

Installation approach

Installation begins after a review of room dimensions, drawings and site readiness. The final technical scope and schedule are confirmed before manufacturing and on-site execution.

PPGI / GI sandwich PUF panels

This is the panel most Indian hospitals choose. It keeps both the initial investment and the long-term cost low, installs quickly, and lasts 10 to 15 years. A fresh coat of anti-fungal, anti-bacterial paint every four to five years keeps the surface performing like new.

Specification

  • Overall panel thickness: 50 mm or 100 mm
  • Facing sheets: PPGI, 0.80–1.00 mm on both sides
  • OT GI sheet: 0.80–1.00 mm, finished with anti-fungal, anti-bacterial paint for a smooth, jointless surface
  • Colours: standard shades or your choice

What PPGI contributes to the room

PPGI is pre-painted galvanised iron, used as a facing in a panel-based theatre system. Buyers should distinguish the metal face from the panel core, supporting frame and any further site finish. The same acronym can describe different assemblies. Ask for a complete section drawing and confirm whether the quotation includes factory-finished surfaces, additional coating or both. This avoids comparing a basic panel supply with a completed OT lining.

Where this option can be practical

PPGI deserves consideration when the hospital wants a coordinated metal-panel room and a clearly defined finish-maintenance route. The choice should reflect trolley traffic, cleaning practice and the anticipated changes to services. Existing wall condition and the available room area still need surveying. A planned panel grid allows door openings and equipment recesses to be settled before manufacturing instead of cutting around them after delivery.

Advantages and points to watch

The practical attraction is a fabricated panel system that can be coordinated with the rest of the room. The points to inspect are exposed edges, damaged coating, panel joints and details around service penetrations. A metal facing alone does not establish fire behaviour, cleanability or a particular classification for the entire assembly. Assess the exact offered construction and retain its supporting documents as part of the hospital’s project record.

Finish choices and approval samples

Discuss whether the visible face is retained as supplied or finished on site, and agree the colour reference and sheen. Examine how a repaired area will match the surrounding wall. The earlier company-supplied panel details on this page should be read with a project-specific drawing; they do not replace agreement on the complete room scope.

Cleaning and ongoing maintenance

Inspect areas vulnerable to knocks, particularly trolley routes, door jambs and movable-equipment positions. Use the finish supplier’s approved cleaning method and report coating damage before an exposed edge deteriorates. Ask for the process to repair a damaged face and reseal service access after maintenance. Housekeeping and engineering teams should have separate responsibilities: cleaning does not substitute for a structural or finish repair.

Site preparation and lead time

Panel fabrication follows approval of room measurements and service openings. On site, coordinate supports, doors, ceiling and finish work so trades do not damage completed surfaces. If the specified assembly uses a site coating, include preparation and cure requirements in the schedule.

Comparing the proposed room shell

Ask whether the offer includes the core, framework, access panels, sealed junctions, coating and installation. Compare future repair access and service coordination with stainless steel, HPL and jointless-finish alternatives. Review any maintenance commitment separately from the equipment warranty. A useful quotation identifies what the hospital’s civil and MEP teams must deliver before installation, and which checks must be complete before the theatre can be handed over.

Comparison with other OT options

Use this table as a shortlist for the design discussion, not a performance ranking. Different suppliers may offer different assemblies under the same material label. Request documentation, approved samples and maintenance instructions for each proposed system. No price, lifespan or certification is inferred from a material name.

OptionBuyer review point
HPLLaminate-facing assembly; check grade, edges and cleaning compatibility
BiocladSpecified cladding; confirm product identity and junction system
PPGICoated steel-facing system; review coating repair and exposed edges
GlassSpecified glass lining; plan openings, safe handling and replacement
Stainless steelMetal surface; agree grade, finish and cleaning method
JointlessContinuous-finish approach; review substrate, cure and local repairs
Semi modularSelective upgrade; establish retained-system condition and interfaces

Related planning pages

Complete modular operation theatre · OT wall panel selection · Indicative Modular OT cost guide

Frequently Asked Questions

What does a PPGI Modular OT project include?

The final scope is prepared around room dimensions, selected panel system, airflow, doors, controls, medical gases and installation requirements.

How is PPGI Modular OT pricing calculated?

Pricing depends on room size, material selection, equipment integration and site scope. We provide a project-specific quotation after reviewing your requirement.

How should we compare PPGI Modular OT with other options?

Compare the complete assembly, not the material name alone. Review backing, supports, junctions, service access, cleaning compatibility and the repair or replacement method against the hospital's approved requirements.

How should PPGI Modular OT surfaces be maintained?

Follow the offered material and finish supplier's cleaning instructions, inspect damaged surfaces and service junctions, and use an approved repair method. Material selection does not replace hospital infection-control procedures.

What is the lead time for PPGI Modular OT?

Lead time is confirmed in the quotation after drawings, approvals and site readiness have been reviewed for the room scope.